| İşveren İdare |
DIRECTORATE GENERAL OF TRANSMIT INSTALLATION AND OPERATION GROUP OF TURKISH ELECTRICITY TRANSMIT, INC |
| İşin Adı ve Yeri |
Construction Of 154 kV KURTALAN Transformer Station (Extension) With ITM.49 Reference |
| Keşif Bedeli |
1.596.173.13 - YTL |
| Sözleşme Tarihi |
10/10/2007 |
|
| İşveren İdare |
DIRECTORATE GENERAL OF TRANSMIT INSTALLATION AND OPERATION GROUP OF TURKISH ELECTRICITY TRANSMIT, INC |
| İşin Adı ve Yeri |
Construction Of 154 kV ALANYA 2 Transformer Station (New) With ITM.50 Reference |
| Keşif Bedeli |
6.059.805.11 YTL |
| Sözleşme Tarihi |
15/11/2007 |
|
| İşveren İdare |
DIRECTORATE GENERAL OF TRANSMIT INSTALLATION AND OPERATION GROUP OF TURKISH ELECTRICITY TRANSMIT, INC |
| İşin Adı ve Yeri |
Construction Of 154 kV BASTAS Transformer Station (Extension) With ITM.50 Reference |
| Keşif Bedeli |
2.587.194.28 YTL |
| Sözleşme Tarihi |
15/11/2007 |
|
| İşveren İdare |
DIRECTORATE GENERAL OF TRANSMIT INSTALLATION AND OPERATION GROUP OF TURKISH ELECTRICITY TRANSMIT, INC |
| İşin Adı ve Yeri |
Construction Of 154 kV SIVAS OSB Transformer Station (New) With ITM.52 Reference |
| Keşif Bedeli |
5.374.528.37 - YTL |
| Sözleşme Tarihi |
18/12/2007 |